2–3 business day turnaround

Earthwork
on demand.

Takeoffs, earthwork reports and GPS machine control models. Upload your plans and tell us what you need. We send a firm price with a delivery date, so you know the cost before any work begins. Earthwork reports start at $500.

2–3 business days standard Quantities checked against the plans Bid-ready format
3D topographic site model with elevation contours
LAT 38.7°N · LON 96.4°W
EL. +124.6 FT
2–3 days
Standard turnaround
Quoted
Firm price before work
Experienced
Earthwork & takeoff team
Per project
No subscriptions or retainers
01 — Services

Takeoffs that win bids.

Pick the takeoff or model you need. Takeoffs come back as a clean report your estimator can drop straight into a bid, and GPS models come back ready to load on your machines. Everything is checked against the plans before delivery. Pricing is quoted per project, so the numbers below are starting points.

Starting at
$500

Earthwork Takeoff & Report

Cut/fill volumes, site grading, soil quantities, haul analysis.

  • 3D surface model
  • Cut & fill volumes
  • Haul distance map
  • Stripped topsoil quantities
Order this takeoff
Starting at
$350

Paving Takeoff

Asphalt, concrete paving, base and subbase quantities.

  • Square yardage by lift
  • Tonnage estimates
  • Base & subbase volumes
  • Striping quantities
Order this takeoff
Starting at
$450

Utility / Pipe Takeoff

Trenching, pipe lengths, structures and fittings.

  • Linear feet by diameter
  • Structure counts
  • Trench volumes
  • Bedding & backfill
Order this takeoff
Starting at
$350

Grading & Site Prep

Clearing, grubbing, demolition and rough grading quantities.

  • Clearing limits
  • Grubbing quantities
  • Demolition schedule
  • Rough grade volumes
Order this takeoff
Starting at
$500

GPS Machine Control & Surface Models

Machine-ready surface models built from your grading and site plans.

  • Finished grade surface
  • Subgrade & layer surfaces
  • Linework & alignments
  • Files ready for your machines
Order this takeoff
Starting at
$1,500

Full Site Package

Every takeoff in one comprehensive report.

  • All earthwork quantities
  • Paving & utilities
  • Site prep schedule
  • Executive summary
Order this takeoff
02 — Process

Four steps. Priced before we start.

01

Tell us what you need

Pick your takeoff, describe the site and scope, and upload your plan set. It takes about three minutes, and no payment is due at this step.

02

We review and quote

We review your plans and send a firm price with a delivery date, so you know the cost before any work begins.

03

You approve and pay

Accept the quote and pay through secure checkout. Work begins the moment your payment clears.

04

We deliver your report

Your takeoff arrives in your dashboard: standard projects in 2–3 business days, large sites typically 4–5.

03 — What you'll receive

What you'll receive.

Takeoffs ship with a report, a quantity spreadsheet and marked-up plans. GPS model orders ship as machine-ready surface files. All of it is completed by a team of experienced earthwork & takeoff professionals.

Earthwork report

Cut and fill volumes, site balance, and haul analysis, laid out so you can price the dirt with confidence.

Quantity spreadsheet

Every itemized quantity in an Excel workbook you can drop straight into your estimate.

Marked-up plan PDF

Your plans returned with takeoff boundaries and quantities marked up sheet by sheet.

Machine control model

For GPS model orders: finished grade and layer surfaces with linework, exported for the machine control system you run.

Files we accept

PDF plan sets, CAD files (DWG/DXF), surface and survey files (LandXML, point files), or a ZIP of everything. PDF-only plan sets are fine for takeoffs. For GPS models, CAD files make the cleanest surfaces.

04 — Pricing

Quoted to your project.

Every project is priced individually, so the numbers below are starting points. Earthwork reports range from $500 to $7,500 depending on project size. You request a quote first, and your firm price and delivery date are confirmed before any work begins. No subscriptions and no retainers.

Earthwork Takeoff & Report

Starting at
$500

Cut/fill volumes, site grading, soil quantities, haul analysis.

Request a Quote

Paving Takeoff

Starting at
$350

Asphalt, concrete paving, base and subbase quantities.

Request a Quote

Utility / Pipe Takeoff

Starting at
$450

Trenching, pipe lengths, structures and fittings.

Request a Quote

Grading & Site Prep

Starting at
$350

Clearing, grubbing, demolition and rough grading quantities.

Request a Quote

GPS Machine Control & Surface Models

Starting at
$500

Machine-ready surface models built from your grading and site plans.

Request a Quote

Full Site Package

Starting at
$1,500

Every takeoff in one comprehensive report.

Request a Quote

Need something custom? Large site or multi-phase? Get in touch.

05 — Why Quantify Pro Takeoffs

Estimator-grade quantities, without the overhead.

Completed by a team of experienced earthwork & takeoff professionals.

Checked against the plans

Every quantity is checked against the plans before delivery.

Clear delivery dates

Standard projects in 2–3 business days and large sites typically 4–5. Your exact delivery date is confirmed in your quote.

Bid-ready format

Quantities, volumes and summaries laid out the way estimators actually use them.

Extra capacity on demand

Add takeoff capacity when bids stack up, without adding staff. Request a quote early and we'll confirm a delivery date that works for your bid deadline.

06 — FAQ

Questions, answered.

Got a bid due Friday?

Request your quote early. We'll confirm a firm price and a delivery date that gets your takeoff back before the deadline.

Request a Quote
07 — Contact

Talk to our team.

Multi-phase site, a large plan set, or just a question about a takeoff? Send us a note and we'll get back to you.